Home Electrical Division Solar Division Communications Division
About Us Contact Us Safety Client List

Solar Division

In response to the growing demand for renewable energy sources, Foy Industrial Electric Corp launched their Solar Division in 2007 with the installation of solar panels atop the 2900 Building in the Shoreline Community College complex. The Shoreline Community College project from implementation to completion took under a month.  Even after structural modifications were completed, Foy Industrial Electric Corp’s contract came in under the engineer’s estimate.

The system was installed on the roof of the 2900 Building while classes were in operation.  Still, classes and business continued normally throughout the entire construction process with zero impact.

We will be installing a 100KW Solar system for Snohomish County School District. Location: Machias Elementry School.

Sunpower

We are an authorized installer for Sunpower.



Solar panels installed at Shoreline Community College.



Expert installation caused zero disruption to classes below.

 

Foy Industrial Electric Corp
2400 NW 80th Street, PMB 118 Seattle, WA 98117-4449
(206) 937-6150
   donny@foyindustrial.com

Bonded, Insured and Licensed in Washington (#FOYINEC015CH) and Oregon (#CCB183652)

 

Copyright © 2008 Foy Industrial Electric Corp |  Website by Detering Designs